Pilot Programme

Prove Ottovis Works
In Your Facility

8–12 week scoped pilot on one line or workcell. We prove value before you commit to full roll-out. Fixed price, clear success criteria, no surprises.

Performance clause included: Early exit option if we materially miss agreed KPIs despite mutual obligations being met.

8–12 Weeks

From deployment to success review

Clear KPIs

MTTR ↓10-20%, search time ↓30-50%, handover ↓50-70%

Low Risk

One line, documents-first, exit option

On-premises deployment • Your data never leaves your facility
The Process

From Discovery to Proven Value

A structured 4-stage process designed to minimize disruption and maximize learning.

Discovery & Setup

Week 1–2

Diagnostic interview with your team. Map SOPs, logs, roles, and security boundaries. Output: Data map, RBAC sketch, pilot proposal.

Walkthrough & SOW

Week 2–3

On-site validation. Confirm scope: one line/workcell, 2-3 SOP bundles, one data source. Issue formal Pilot SOW with success criteria.

Pilot Execution

Week 3–10

Deploy system, train champions (Week 1-2), go live with operators. Weekly reviews with usage dashboard and answer-quality scorecards.

Success Review

Week 10–12

Present KPI deltas (MTTR, search time, handover quality). Capture before/after snapshots. Decide: roll out or exit.

Are You Ready?

Pilot Readiness Checklist

Four critical requirements. Two nice-to-haves. Most UK SME plants meet these criteria already.

Documented SOPs

Required

Standard operating procedures in any format (PDF, Word, SharePoint)

Maintenance Records

Required

Work orders, logs, or CMMS data we can access read-only

Shift Champions

Required

Two operators/supervisors willing to lead adoption (30 mins training)

On-Prem/VPC Acceptance

Required

System runs behind your firewall. No data leaves your facility.

Live Sensor Data (Optional)

Optional

SCADA/historian integration can be added post-pilot

Diagrams/Schematics (Optional)

Optional

P&IDs, electrical drawings—multimodal support in Phase 3

Download the full 10-item checklist to assess your readiness

Success Criteria

How We Measure Success

Pre-agreed KPIs tracked weekly. No ambiguity. Week 10–12 success review presents the evidence.

MTTR

Target: 10–20% reduction

Compare mean time to repair before/after pilot

Search Time

Target: 30–50% reduction

Time operators spend finding SOPs, logs, or procedures

First-Time Fix

Target: Increase rate

Fewer repeat faults or escalations per work order

Handover Quality

Target: 50–70% time saved

Supervisor handover prep time + completeness score

Operator Adoption Rate

≥75% weekly active operators (among trained staff) by Week 8

Measured by: unique logins per week / total trained operators

Transparent Pricing

Fixed Pilot Price,
Clear Path Forward

No hidden fees. No scope creep. Performance clause included.

8-12 Week Pilot

Fixed Pilot Fee

One line/workcell • 2-3 SOP bundles • Documents-first

Contactfor pricing

Pricing depends on facility size, data sources, and integration complexity

Pilot Includes:

Initial discovery & data mapping (Week 1-2)
On-prem/VPC deployment & configuration
Champion training (2 sessions, 30 mins each)
Weekly progress reviews (Weeks 3-10)
Usage dashboard & answer-quality scorecards
Success review presentation (Week 10-12)
Before/after KPI comparison report
Roll-out proposal (if pilot succeeds)

Performance Clause: Early exit option if we materially miss agreed KPIs despite mutual obligations being met.

After Successful Pilot

Convert to site subscription and expand capabilities

Site Subscription

Per-site pricing with seat bundles (operators/supervisors/admin)

Included

Additional Lines

Expand to adjacent production lines or workcells

Add-on

Live Telemetry Integration

Connect SCADA/historian for real-time anomaly detection

Add-on

Multimodal (Diagrams)

P&ID, electrical schematics interpretation (Phase 3)

Add-on

Typical ROI

Average Payback Period

6-12 months

Based On

Time saved per operator × hourly cost + MTTR reduction × downtime cost per hour

All pilots include on-prem/VPC deployment • Your data stays local
Get Started

Ready to Prove
Ottovis Works?

Book a 15-minute readiness clinic to assess your facility's fit, or request a full pilot proposal.

Step 1: Readiness Clinic (15 mins)

Quick qualification call to understand your setup

Step 2: On-Site Walkthrough

Validate scope and issue formal pilot proposal

Step 3: Pilot Kickoff

8-12 weeks to proven value

Serving UK Manufacturing SMEs

Focused on 50-500 employee facilities in food & beverage, utilities, and discrete manufacturing

Request Pilot Proposal

We'll respond within 24 hours to schedule your readiness clinic